• Sept 2010

    Sept 2010

  • 25 July 2011 Preparing the Orchard

    25 July 2011 Preparing the Orchard

  • 30 July 2011 Concreting post for solar tracker

    30 July 2011 Concreting post for solar tracker

  • 1 August 2011 Installing Water Tank

    1 August 2011 Installing Water Tank

  • 2 August 2011 Drilling the Bore

    2 August 2011 Drilling the Bore

  • 1 September 2011 Living Water!!

    1 September 2011 Living Water!!

  • 11 April 2012 Shed & Tool Storage

    11 April 2012 Shed & Tool Storage

  • 7 July 2012 Star of Toilet Shed

    7 July 2012 Star of Toilet Shed

  • 7 July 2012 A Toilet!

    7 July 2012 A Toilet!

  • 9 July 2012 The Throne Room!

    9 July 2012 The Throne Room!

  • 20 August 2012 Preparing the ground for the slab / Groundworks

    20 August 2012 Preparing the ground for the slab / Groundworks

  • 15 Dec 2012 Prep for first rammed earth wall test!

    15 Dec 2012 Prep for first rammed earth wall test!

  • 20 August 2012 Testing the wall

    20 August 2012 Testing the wall

  • 28 Nov 2013 Testing retaining wall design and process

    28 Nov 2013 Testing retaining wall design and process

  • 5 Feb 2014 More retaining walls

    5 Feb 2014 More retaining walls

  • 28 Feb 2014 Mixing 10m3 of concrete for retaining wall base

    28 Feb 2014 Mixing 10m3 of concrete for retaining wall base

  • 3 March 2014 One solid base for retaining walls with Rebar

    3 March 2014 One solid base for retaining walls with Rebar

  • 6 September 2013 House Pad Getting close to height

    6 September 2013 House Pad Getting close to height

  • 7 March 2014 Starting formwork for Slab Retaining

    7 March 2014 Starting formwork for Slab Retaining

  • 11 March 2014 First Slab retaining wall section

    11 March 2014 First Slab retaining wall section

  • 17 March 2014 Slab retaining showing toilet cut ins

    17 March 2014 Slab retaining showing toilet cut ins

  • 7 July 2014 Carport Reatining Wall

    7 July 2014 Carport Reatining Wall

  • 11 July 2014 House Pad nearly ready!

    11 July 2014 House Pad nearly ready!

  • 2 August 2014 Pouring the Footings!

    2 August 2014 Pouring the Footings!

  • 2 August 2014 Pouring the Footings!

    2 August 2014 Pouring the Footings!

  • 9 October 2014 Under Floor Plumbing

    9 October 2014 Under Floor Plumbing

  • 6 November 2014 Laying Black PLastic for Slab

    6 November 2014 Laying Black PLastic for Slab

  • 6 November 2014 Forms, Black Plastic and SL72 Mesh

    6 November 2014 Forms, Black Plastic and SL72 Mesh

  • 17 November 2014 Pouring the Slab!

    17 November 2014 Pouring the Slab!

  • 17 November 2014 Concrete Boom Truck

    17 November 2014 Concrete Boom Truck

  • 17 November 2014 COncrete Last section of Main Slab

    17 November 2014 COncrete Last section of Main Slab

  • 18 August 2015 1 House Wall Forming Up!

    18 August 2015 1 House Wall Forming Up!

  • 8 September 2015 Today is THE day! First House Wall aabout to be rammed!!!

    8 September 2015 Today is THE day! First House Wall aabout to be rammed!!!

  • 9 September 2015 about to unveil the first wall...did it work?!

    9 September 2015 about to unveil the first wall...did it work?!

  • 9 September 2015 YES! First wall of house - Bedroom 1 NW Corner

    9 September 2015 YES! First wall of house - Bedroom 1 NW Corner

  • 18 September 2015 Chill in the chill with the fire in the house!

    18 September 2015 Chill in the chill with the fire in the house!

  • 18 September 2015 House wall #2 formed up!

    18 September 2015 House wall #2 formed up!

  • 22 September 2015 House wall 2 complete, #3formed up

    22 September 2015 House wall 2 complete, #3formed up

  • 25 September 2015 House Wall 1,2,3

    25 September 2015 House Wall 1,2,3

  • 5 October 2015 House Wall 1,2,3,4

    5 October 2015 House Wall 1,2,3,4

  • 18 October 2015 South Wall 1,2 SW

    18 October 2015 South Wall 1,2 SW

  • 18 October 2015 ¾ of the North and South Walls Done!

    18 October 2015 ¾ of the North and South Walls Done!

  • 24 October 2015 West Wall #2 this was HIGH - see YT video

    24 October 2015 West Wall #2 this was HIGH - see YT video

  • 24 October 2015 First Middle Support Wall 4.2m

    24 October 2015 First Middle Support Wall 4.2m

  • 8 November 2015 Bathroom Wall with Shower fittings

    8 November 2015 Bathroom Wall with Shower fittings

  • 8 November 2015 House taking shape!

    8 November 2015 House taking shape!

  • 12 November 2015 Middle Support Wall #2

    12 November 2015 Middle Support Wall #2

  • 13 November 2015 Ready to unveil

    13 November 2015 Ready to unveil

  • 21 November 2015 Wire Brushing Support Wall #4

    21 November 2015 Wire Brushing Support Wall #4

  • 30 December 2015 Main Window Lintels Lounge NE

    30 December 2015 Main Window Lintels Lounge NE

  • 11 Dec 2016 Kitchen Laundry Toilet Urinal Wall LOTS of elec & plumbing!

    11 Dec 2016 Kitchen Laundry Toilet Urinal Wall LOTS of elec & plumbing!

  • DATE? A View of the Internal Walls from above

    DATE? A View of the Internal Walls from above

  • DATE? Walls Finished?!

    DATE? Walls Finished?!

  • 3 January 2017 Workers carrying the Panels for North Roof

    3 January 2017 Workers carrying the Panels for North Roof

  • 11 December 2016 First Roof Panels up!!

    11 December 2016 First Roof Panels up!!

  • 19 January 2017

    19 January 2017

  • 25 Febuary 2017 Internal insulated ceiling

    25 Febuary 2017 Internal insulated ceiling

  • 25 May 2017 Main Truss Upper & Lower Chords in place

    25 May 2017 Main Truss Upper & Lower Chords in place

  • 21 June 2017 Ready to start welding ribs in the Truss

    21 June 2017 Ready to start welding ribs in the Truss

  • 8 Dec 2017 Bath Formed

    8 Dec 2017 Bath Formed

  • 12 December 2017 First Window in - Double Glazed

    12 December 2017 First Window in - Double Glazed

  • 22 December 2017 Main Stacking Doors installed!

    22 December 2017 Main Stacking Doors installed!

  • 22 December 2017 View from the Lounge Looking North

    22 December 2017 View from the Lounge Looking North

  • 11 April 2018 Installing Kitchen LIghts and Ceiling Panels

    11 April 2018 Installing Kitchen LIghts and Ceiling Panels

  • 11 April 2018

    11 April 2018

  • 30 April 2018 Hawke doing the Epoxy Flooring

    30 April 2018 Hawke doing the Epoxy Flooring

  • 1 May 2018 Hawke doing the Epoxy Flooring

    1 May 2018 Hawke doing the Epoxy Flooring

  • 1 May 2018 Sweeping off the ALum Epoxy Flooring

    1 May 2018 Sweeping off the ALum Epoxy Flooring

  • 1 May 2018 Hawke doing the Epoxy Flooring

    1 May 2018 Hawke doing the Epoxy Flooring

  • 18 May 2018 Pano of Front Room

    18 May 2018 Pano of Front Room

  • 28 July 2018 Games Room TV installed

    28 July 2018 Games Room TV installed

  • 28 July 2018 Digging drainage for Ensuite Toilet

    28 July 2018 Digging drainage for Ensuite Toilet

  • 28 July 2018 Absorbtion Trench nearly finshed

    28 July 2018 Absorbtion Trench nearly finshed

  • 28 July 2018 Composting Toilet Chamber

    28 July 2018 Composting Toilet Chamber

  • 28 July 2018 Mum has a TOILET!!!

    28 July 2018 Mum has a TOILET!!!

  • 28 July 2018 Ensuite TOILET!!!

    28 July 2018 Ensuite TOILET!!!

  • 27 May 2018 First High Tea

    27 May 2018 First High Tea

  • 7 August 2018 Kitchen Cabinets assembly

    7 August 2018 Kitchen Cabinets assembly

  • 7 August 2018 Kitchen Cabinets

    7 August 2018 Kitchen Cabinets

  • 9 August 2018 Kitchen Cabinets

    9 August 2018 Kitchen Cabinets

  • 16 August 2018 Kitchen Cabinets

    16 August 2018 Kitchen Cabinets

  • 16 August 2018 Breakfast Bar cabinets

    16 August 2018 Breakfast Bar cabinets

  • 15 September 2018 Cutting out the Kitchen PLumbing

    15 September 2018 Cutting out the Kitchen PLumbing

  • 15 September 2018 Under sink Plumbing

    15 September 2018 Under sink Plumbing

  • 17 September 2018 Cutting out the Kitchen Sink base

    17 September 2018 Cutting out the Kitchen Sink base

  • 17 September 2018 Cutting out the Kitchen Sink base

    17 September 2018 Cutting out the Kitchen Sink base

  • 16 October 2018 GFRC Bench #1

    16 October 2018 GFRC Bench #1

  • 16 October 2018 GFRC Bench #1 Polishing

    16 October 2018 GFRC Bench #1 Polishing

  • 17 October 2018 Bench Frame Welded

    17 October 2018 Bench Frame Welded

  • 17 October 2018 Testing the GFRC Bench #1

    17 October 2018 Testing the GFRC Bench #1

  • 22 October 2018 GFRC Bench #1

    22 October 2018 GFRC Bench #1

  • 10 November 2018 Laundry Cupboards & Bench

    10 November 2018 Laundry Cupboards & Bench

  • 10 November 2018 Laundry Cupboards & Bench

    10 November 2018 Laundry Cupboards & Bench

  • 20 November 2018 Preparing GFRC Batches for Kitchen Counter Top

    20 November 2018 Preparing GFRC Batches for Kitchen Counter Top

  • 22 November 2018 GFRC Kitchen Counter Top

    22 November 2018 GFRC Kitchen Counter Top

  • 22 November 2018 GFRC Kitchen Counter Top

    22 November 2018 GFRC Kitchen Counter Top

  • 4 December 2018 Kitchen Sinks

    4 December 2018 Kitchen Sinks

  • 4 December 2018 Bathroom Bench

    4 December 2018 Bathroom Bench

  • 4 December 2018 Laundry Bench & Sink

    4 December 2018 Laundry Bench & Sink

  • 5 December 2018 Kitchen Plumbing

    5 December 2018 Kitchen Plumbing

  • 5 December 2018 Kicthen nearly done!

    5 December 2018 Kicthen nearly done!

  • 11 January 2019 Bathroom Sink Cut out

    11 January 2019 Bathroom Sink Cut out

  • 11 January 2019 Bathroom Sinks

    11 January 2019 Bathroom Sinks

  • 11 January 2019 Bathroom Cabinet

    11 January 2019 Bathroom Cabinet

  • 12 January 2019 Starting the Pantry Shelviing

    12 January 2019 Starting the Pantry Shelviing

  • 12 January 2019 Starting the Pantry Shelviing

    12 January 2019 Starting the Pantry Shelviing

  • 14 January 2019 Pantry Shelving

    14 January 2019 Pantry Shelving

  • 16 January 2019 Pantry Shelving

    16 January 2019 Pantry Shelving

  • 16 January 2019 Pantry Shelving

    16 January 2019 Pantry Shelving

  • 28 March 2019 N Verandah Base Foundation

    28 March 2019 N Verandah Base Foundation

  • 28 March 2019 N Verandah Base Foundation Mesh

    28 March 2019 N Verandah Base Foundation Mesh

  • 29 March 2019 N Verandah Base Foundation Concrete

    29 March 2019 N Verandah Base Foundation Concrete

  • 1 April 2019 N Verandah Support Walls Formed Up

    1 April 2019 N Verandah Support Walls Formed Up

  • 1 April 2019 N Verandah Support Walls Formed Up

    1 April 2019 N Verandah Support Walls Formed Up

  • 1 April 2019 N Verandah Support Walls Ramming

    1 April 2019 N Verandah Support Walls Ramming

  • 1 April 2019 N Verandah Support Walls Ramming

    1 April 2019 N Verandah Support Walls Ramming

  • 1 April 2019 N Verandah Support Walls Ramming

    1 April 2019 N Verandah Support Walls Ramming

  • 1 April 2019 N Verandah Support Walls Ramming

    1 April 2019 N Verandah Support Walls Ramming

  • 1 April 2019 N Verandah Support Walls Finishing

    1 April 2019 N Verandah Support Walls Finishing

  • 1 April 2019 N Verandah Support Walls

    1 April 2019 N Verandah Support Walls

  • 2 April 2019 N Verandah Support Walls Unveiled

    2 April 2019 N Verandah Support Walls Unveiled

  • 5 April 2019 N Verandah Support Walls

    5 April 2019 N Verandah Support Walls

  • 5 April 2019 N Verandah Support Walls

    5 April 2019 N Verandah Support Walls

  • 6 April 2019 N Verandah Support Walls

    6 April 2019 N Verandah Support Walls

  • 8 April 2019 N Verandah Step Walls

    8 April 2019 N Verandah Step Walls

  • 9 April 2019 N Verandah Step Walls

    9 April 2019 N Verandah Step Walls

  • 8 April 2019 N Verandah Walls

    8 April 2019 N Verandah Walls

  • 11 April 2019 N Verandah Step Walls

    11 April 2019 N Verandah Step Walls

  • 12 April 2019 N Verandah Filling with Sand

    12 April 2019 N Verandah Filling with Sand

  • 12 April 2019 N Verandah Filling with Sand

    12 April 2019 N Verandah Filling with Sand

  • 17 April 2019 N Verandah Plumbing

    17 April 2019 N Verandah Plumbing

  • 17 April 2019 N Verandah Plumbing

    17 April 2019 N Verandah Plumbing

  • 30 April W Support Wall Ramming

    30 April W Support Wall Ramming

  • 1 May W Support Wall

    1 May W Support Wall

  • 18 July 2019 N verandah Filled with Sand

    18 July 2019 N verandah Filled with Sand

  • 28 September 2019 INstalling Flashings

    28 September 2019 INstalling Flashings

  • 3 October 2019 Painting the Doors!

    3 October 2019 Painting the Doors!

  • 3 October 2019 Painting the Doors!

    3 October 2019 Painting the Doors!

  • 3 October 2019 Painting the Doors!

    3 October 2019 Painting the Doors!

  • 5 October 2019 Door Frames INstalled

    5 October 2019 Door Frames INstalled

  • 18 December 2019 Sinatlling top Roof Flashings

    18 December 2019 Sinatlling top Roof Flashings

  • 18 December 2019 Sinatlling top Roof Flashings

    18 December 2019 Sinatlling top Roof Flashings